The information requested in this application form corresponds to the requirements of the terms and conditions for ecoENERGY for Renewable Power. The TPI form can be submitted at any time after the NPA has been accepted and the expected commissioning date of the project is less than 20 months from receipt of TPI. Ensure that all requested information is enclosed with your application. Please provide one hard copy and one electronic/digital copy of the application and attachments. Scanned documents in PDF format are acceptable.

(The bolded letters to the left correspond to those letters in Step 2 of the program's Terms and Conditions document.)

Section 1 - Information about the Proponent

a    

  
(refer to your Notice of Project Application approval)

     yyyy/mm/dd

  

  

b1   

b2 Address of the legal entity:

  

  

        

  
(e.g. limited partnership, corporation, Crown corporation)

  
(province or territory)

  

  



b3 Ownership of the project (list all owners and their proportion in percentages, show on a separate page if more than four):

     

     

     

     

      



b4 List of related companies participating in other ecoENERGY for Renewable Power projects, if any (show on a separate page if more than four):

  

  

  

  



c    

  

Contact address (if different from b2)

  

  

        

Other contact information

  

  

  




Section 2 - Information about the proposed project

d  
 (provide maps in A2)


e  Capacity of the proposed project in MW

  

  

  

  



f  Expected average annual production in GWh (provide calculations in A5)

  

  

  

g      yyyy/mm/dd
(show timeline of construction phases in A7)


h  Information about the power plant

  

  

  

i (Wind)  -     m/s  @
    (show how this is estimated in A4)

i (hydro)  -      m3/s  @
    (show how this is estimated in A4)

i (PV)  -      kWh/m2  @
    (show how this is estimated in A4)

i (biomass)  -      m3
    (show how this is estimated in A4)

i (other)  -      (quantity)
    (show how this is estimated in A4)

j  
  yyyy/mm/dd


k  
  GWh        Purchaser



l  
  ¢/kWh




Section 3 - Supporting documents
The following information must be attached to your TPI.  Label each piece with the letter assigned for the information as indicated to the left column below. For more information, refer to the ecoENERGY for Renewable Power Terms and Conditions document.

A1  Short description of the project, including size, site location, ownership of project and rationale.  

  



A2  Area map of the project location, including coordinates and a detailed map showing the location of main elements of the project.  

  



A3  Evidence that the proponent has access rights to the required land (e.g. licence agreement, lease, easement agreement).  

  



A4  Description of the steps followed to evaluate the resource for the project and show calculations on how it was estimated.  

  



A5  Description of assumptions and calculations of expected net average electricity production on a yearly basis.  

  



A6  Technical characteristics of the power plant (specification sheets and power curves).  

  



A7  Description of proposed construction stages and the expected starting date for the main stages. Provide timelines.  

  



A8  Other sources of government funding, if any.  

  



A9  Permits or proof of approvals for construction and operation of the power plant and connecting station by responsible authorities.  

  



A10  Approval of the inter-connection and transmission design by responsible authorities.  

  



A11  Description of the metering plan (metering authority's name, meter's location and methodology for net energy measurements).  

  



A12  Environmental Choice Program's Letter of Opinion, if applicable.  

  



A13  Proof that the project has received all other relevant federal permits that are not related to the environment.  

  



A14  Proof that the project has received the required provincial/territorial environmental authorizations and all other permits that are not related to a federal environmental assessment.  

  



A15  Letter of intent from financial partners or an indication of financial capacity to carry on the project.  

  


A16  Update information on concerned First Nation/Aboriginal positions on project 

  




Important: Failure to provide all of the above information may delay review of the application over the 30 business days stipulated under Step 3 of the terms and condition.

The Application must be reviewed and signed by the Applicant.