Cost Information for Projects Under the ecoENERGY for Renewable Power program as Required under Annex B of Contribution Agreement

PROTECTED INFORMATION WHEN COMPLETED

Costs Description

Initial Development Costs
These costs include all pre-construction costs, including surveys, resource assessment, environmental assessment, project design and business plan costs.
Environmental Assessment Costs
When possible, please provide environmental assessment costs separately.
Component Costs
These costs include all component costs including their transportation to construction site.
Construction and Labour Costs
These costs include all costs incurred during construction of the project at the construction site and include all labour and machinery costs to build structures, housing, roads, interconnection, substation and Supervisory Control and Data Acquisition (SCADA) system. They also include legal, insurance, and permitting costs for construction.
All Annual O&M Costs
These costs are reported as average annual costs over the first 20 years of operation of the plant and include all labour and material costs as well as annual costs such as land lease and insurance and allowances for periodic repair and replacements of components.
(Annual costs are reported over a period of 20 years and should not be discounted in order to compare these costs for different technologies.)

Mandatory fields are indicated with an asterisk (*).

Project Information

Project Costs

$

$

$

$

Operation and Maintenance Costs per year

$

Once this form is filled, the information provided will be protected and may be used only in aggregated format.